I was a project manager in the Steam Generator Owner's Group at the Electric Power Research Institute (EPRI). In other words, I am a steam generator expert.
Which led me to a bit of an email battle yesterday about the Southern California Edison decision to close the San Onofre nuclear plants (SONGS). The question under debate was whether the NRC was being reasonable in saying they needed a year to determine whether SONGS would be able to re-open. My friend said that the delay would improve safety. I felt the NRC was being unreasonable.
Here is my email to my friend. I include background and links at the end of the post.
---------Well, let's say that I am not sure about the existence of "technical questions of safety." The tube wear issue was caused by an unexpected vibration mode in the steam generators, and changing the power to 70% changes the vibration pattern. Changing the power output should put the SONGS steam generators into an operational mode in which that type of vibration will not happen.
Also, unless quite a few steam generator tubes break at once, a tube break is not a safety issue that should affect anyone outside the plant. Operating at a lower power is less likely to cause a tube rupture in the first place, and SONGS was going to check the condition of the tubes after six months of lower-power operation. I would bet a bunch of money (if I could) that the tubes would be fine after the six month test. Then they could run the plant longer. I don't know why the NRC needs over a year to look at the safety implications of operating a plant at lower power. It seems excessive to me, and I don't mind saying so.
Look, I am not saying it's a just a public-relations problem or that the utility or the steam generator supplier did everything right and they are being picked on by the NRC, etc. I am just saying that we have forgotten some basic facts about how steam generators work.
And we may have forgotten some basic facts about the NRC, which may yet lead to closing more plants and never licensing new ones. The NRC takes insane amounts of time to do anything, and is very vulnerable to intervenor pressures. For example, they reviewed the Duane Arnold relicense in about two years, and they took over five years for Vermont Yankee. These two are sister plants, but
![]() |
| Los Angeles Smog, 2005 |
Oh by the way. Some of the first engineering projects I worked on were funded by CARB and EPA, about trying to cut NOx pollution in the LA basin. Gonna be fun, replacing SONGS with gas-burners in that neck of the woods. I absolutely hate it. It didn't have to happen.
--------
SONGS Background
San Onofre Nuclear Generating Station (SONGS) consists of three separate plants, two of which were operating and one was retired. The two operating plants added up to more than 2000 MW of capacity. In January 2012, after excessive tube wear was discovered in newly-purchased steam generators, Southern California Edison took SONGS off-line for more inspections and possible changes. The wear was due to an unexpected form of vibration, which caused some tubes to rub against each other. Edison submitted a plan to the Nuclear Regulatory Commission (NRC) for restarting one of the reactors: the unit would run at lower power (70% power) which should eliminate the vibration. It would run at this power for five months, and then be carefully inspected.
After a request by anti-nuclear groups, the NRC determined that the proposal to limit SONGS Unit 2 to 70% power would require the plant to obtain a license amendment. The license amendment process requires public hearings and would take more than a year. The NRC made this decision in May.
Faced with this delay and uncertainty about the NRC process, on June 7 (yesterday), Southern California Edison said it would permanently close the two SONGS units.
References:
Matt Wald of the New York Times on closing San Onofre
Will Davis at ANS Nuclear Cafe on closing San Onofre: Excellent overview and links
Will Davis blog post on Steam Generator Design, at his blog, Atomic Power Review
My post on Steam Generator Design and Testing, also at Atomic Power Review
Bloomberg news on regulatory battles on shut-down costs
Nuclear Energy Institute blog post on the need for a predictable regulatory process
Nuclear Energy Institute blog post on the need for a predictable regulatory process
Let me finish with a quote from Will Davis at ANS Nuclear Cafe. He sums up the situation beautifully:
Some might quickly respond that it was technical problems that killed the plant. Perhaps in the bigger picture, this is correct; but in the earlier days of nuclear energy, quite a large number of technical problems were encountered in nuclear plants and overcome after testing periods.
As I said above: This shutdown didn't have to happen.